PROJECT INFO
Part of the resort was reconstructed and modified to 8 Royal Suites and 4 Presidential Suites bungalows. The owner decided to refurbish the existing hotel unit by reconstructing the Bungalows.
PROJECT FIGURES
ABOVE GROUND SURFACE | 2.400 m² 8 units of one level bungalows (Royal Suite) 1.800 m² 4 units of two levels bungalows (Presidential Suite) |
CONSTRUCTION DURATION | 22 months |
CONSTRUCTION BUDGET | 18.000.000 € |
DIARCHON’S ROLE
Designs
- Architectural design
- Structural design
- Design Coordination (structural, MEP, special designs, etc)
Project Management
The project includes the preparation of the tender documents and the supervision of the works execution by the Contractors.