PROJECT INFO
The building consists of 2 basements, groundfloor and 5 floors above ground level.
PROJECT FIGURES
ABOVE GROUND SURFACE | 1.050 m² |
BASEMENTS SURFACE | 7.500 m² |
BUILDING VOLUME | 70.000 m³ |
DESIGN DURATION | January – July 2002 “Cold Shell” |
May – September 2002 “Hot Shell” | |
CONSTRUCTION TENDER | October 2002 |
CONSTRUCTION CONTRACT | 16 months |
CONSTRUCTION DURATION | 12 months |
CONSTRUCTION BUDGET | 34.000.000 € |
DIARCHON’S ROLE
Designs
- Architectural design
- Structural design
- Design Coordination (structural, MEP, special designs, etc)
Project Management